TOWN HALL REHABILITATION PROJECT

July 18, 2017 - Week #10

The remainder of the concrete pads in the basement have been poured for the fire pit and the platform lift.  DODGCO continues to install the new framing for the 2nd floor, and the framing contractor has started to build the new egress stair addition.

beam removal over stage.jpgdown to stage.jpg
framing rear stairs.jpgfire pump pit.jpg

July 6, 2017 - Week #8

Work continues on the installation of new beams for the 2nd floor and the foundation for the new rear stairs has been poured.

new foundation.jpgwall removal.jpg
new beam over entrance.jpgchimneys.jpg

June 21, 2017 - Week #6

Work has been completed on the removal of the second floor.  The water tanks have been moved into the basement and placed on a new concrete slab, and the foundation for the new stairwell addition has been poured.  Next week, DODGCO will begin working on the new structural framing for the 2nd floor and framing for the addition will begin.

first floor looking at back walls-stage.jpgtop of stairs looking down.jpg
tanks in basement 1.jpgnew foundation looking east 1.jpg

June 9, 2017 - Week #4

This week was continued demolition of the interior 1st floor ceiling and the installation of temporary bracing before the floor boards are removed.   The frst concrete for the job also arrived this week.  This was for the new footings for the south foundation wall and new addition.

Interior 1st flr ceiling toward entrance.jpgInterior 1st Flr Ceiling toward Stage.jpg
footings south wall.jpgsecond pour.jpg

June 2, 2017 - The Tanks Arrive

The tanks for the fire suppression system have arrived.  These tanks will be located in the basement.  A total of 15,000 gallons of water will be required.  

Watertanksweb.jpgTanks in Shed.jpg

May 30, 2017 – Demolition Continues

This week the demolition continues with the shoring and removal of the rear wall.  The windows have been removed for restoration, and the first floor ceiling is being taken down.  

Rear Shoring.jpgFront Windows.jpg
Ceiling Removal 1.jpg

May 22, 2017 – Demolition Begins

This week the demolition began on portions of the Town Hall.  There were 4 trees removed from the rear of the property to make way for the new staircase addition, the old fire escapes were removed, and the existing rear restroom addition was removed.
Fire Escape2.jpgAddition Removal2.jpg
           

May 15, 2017 – Groundbreaking Ceremony

The Groundbreaking Ceremony was attended by the Board of Selectmen, Heritage Commission, the DEW/MacMillin Team, and other residents of the community.
622017_100356_2.jpg


 